RIVER COMMISSION ECONOMIC DEVELOPMENT AND COMMERCE COMMITTEE MINUTES: Minutes of meeting |
Feb. 11, 2003 3:00 PM (THIS IS A PUBLIC DOCUMENT) |
|
The Miami River Commission’s (MRC) Economic Development and Commerce (EDC) Working Group convened on February 11, 2003, at 2:30 PM, in the Rosenstiel School, 4600 Rickenbacker Causeway, Library Map Room. Cleve Jones Jr. and Megan Kelly chaired the meeting. The sign in sheet is enclosed. |
|||
Professor Richard Weisskoff presented the
draft “Comparing Costs of Options for Reconstructing the 12th
and 27th Avenue Bridges Over the Miami River”, commissioned
by the MRC. The study
compared initial construction costs, and the estimated maintenance
costs, over a 70-year life cycle, for both bascule bridges and tunnels
located at 12th and 27th Avenues.
In addition, Weiscoff explained the report estimated the value of
time lost for commuters stopped during bridge openings at both 12th
and 27th Avenues. In
order to accurately model these estimates, the bridge opening records
were obtained from bridge tenders at these locations, and traffic
surveys were obtained from the Florida Department of Transportation (FDOT).
Weisskoff stated tunnel developers are able to use new air
circulation technology and tunnel construction technology, which has
significantly reduced tunnel construction costs.
Weisskoff studied the Fort Lauderdale tunnel under the New River
and found that Ft. Lauderdale officials determined the need for
constructing their tunnel beneath the New River, without economic
studies. The study concludes that over a 70-year
life, the two tunnels would cost $1.4 million less than two bridges at
these locations. The group
agreed that this fact must be placed in the report’s executive
summary. Projected traffic
growth rate was conservatively estimated at only 1% per year.
The number of passengers per vehicle was conservatively estimated
at 1.1 people per vehicle. Weiscoff
will add the existing bridge opening curfew information. Mr. Jorge Estevez recommended a revision to the final
sentence on page 7, and adding an explanation to justify the 70-year
bridge (current river bridge average) and tunnel life cycle.
Weiscoff will verify that the expected life cycle of a tunnel is
70 years or longer. The EDC
unanimously recommended the draft report, with agreed upon revisions, be
presented to the MRC on March 3, 2003 with the recommendation that the
report be accepted and forwarded to the FDOT, City, County, and other
transportation officials. Weisskoff
stated he would provide the revised draft report to MRC staff for
inclusion in the MRC board member’s February mail out package.
The EDD confirmed their next regularly
scheduled 2nd Tuesday of the month meeting, March 11, 2:30
PM, in the University of Miami, Rosenstiel School, 4600 Rickenbacker
Cswy., Dean’s Conference Room. |
|||