MIAMI RIVER COMMISSION 
c/o Rosenstiel School
4600 Rickenbacker Cswy
Miami, Fl. 33149
305-361-4850
Fax: 305-361-4755
e-mail: miamiriver@bellsouth.net

Greenway Goals and Objectives  Greenways Overview
 Greenways project themes


Our vision will be realized
in part through the adoption and implementation of these goals and objectives:


GOAL 1: Improve access to the river

GOAL 2: Sustain the "working river" industries of the Miami River

GOAL3: Restore water quality throughout the river ecosystem

GOAL 4: Serve as a destination landscape for Metro Miami;

GOAL 5: Encourage a compatible land use vision for the river;

GOAL 6: Foster an ethic of stewardship for the river;

GOAL 7: Celebrate the multicultural diversity of adjacent neighborhoods.



 

This site prepared and designed by
Mark Sell Communications, Inc. Public Relations

          HOME   |     CALENDARS    |   ABOUT THE RIVER      |    ABOUT THE COMMISSION     |    DREDGING   |   GREENWAYS     
URBAN INFILL PLANS      
|     STORMWATER RETROFITTING     |       MINUTES OF MEETINGS   |    LINKS